Berger Home Page George Washington Bridge, New York/New Jersey USA Esquimalt Graving Dock, Victoria, British Columbia CANADA Green Line Mass Transit Project, Boston, Massachusetts USA Highway Design, Guinea AFRICA Lake Chelan Hydroelectric Project, Washington USA Computer Supported Management Training Program, Guangdong, China ASIA Channel Tunnel, UK/France EUROPE Wetland Mitigation Banking, Hackensack Meadowlands District, New Jersey USA I-295 Interchange, New Jersey USA Archaeological Investigations, Washington Navy Yard, Washington, DC USA Newark Airport Monorail, New Jersey USA

  
About Us    Locations    Sectors    Services    News
     Employment    Login    Contact Us

The Ankara Metro

Ankara Metro

The Ankara Metro Consultants, with The Louis Berger Group as the lead partner of the joint venture (63%), was awarded a contract to perform engineering and project management services to the Greater Municipality of Ankara for the design construction and operation of the 14.6 kilometer Phase I Ankara Metro Heavy Rail Project. Total construction contract value is approximately USD 660 million Contract duration includes 48 months during construction/ installation and an additional 12 months for the commercial operation phase.

The contract for engineering and project management services was awarded on 29 April, 1993. Current value of engineering services including contingency id USD 11.042,157. Of this amount approximately USD 4 million is the engineering and design review portion. On 29 December, 1997 the system was open for revenue service.

The scope of design services provided includes the following items for Phase I together with appropriate provisions to accommodate system expansion:

1. Stations (Approximate Value of Design Related Work USD 650,000)
Engineering and design review, and construction supervision for 12 stations including 4 underground (one central transfer station with the light rail system), 2 elevated, and 6 in cut and cover or at-grade. Engineering and design aspects included:

ALIGNMENT: Plans and Profiles, Trackwork

CIVIL: Excavation and Formwork/Erection Plans, Structural, Protection of Adjacent Properties and Structures, Maintenance and Protection of Traffic, Utility Relocation.

ARCHITECTURAL: Architectural Plans and Profiles, Vertical and Horizontal Circulation, Interaction with the Environment and Urban Setting, Architectural Finishes and Details, Intermodal Transfer Facilities.

BUILDING SERVICES: Mechanical, Heating, Ventilating and Air Conditioning, Electrical, Escalators, Fire Protection and Detection.

2. Tunneling (Approximate Value of Design Related Work USD 1,200,000)
Engineering and design review, and construction supervision for 2,570 kilometers of cut and cover 0.160 kilometers of hand mined, and 3.061 kilometers of bored tunnel using full face tunnel boring machine. Engineering and design aspects included:

ALIGNMENT: Plan and Profile, Certification of Vehicle Dynamic Envelope, Inc